Chinese
|
English
HENAN CHANGZHENG ELECTRIC CO., LTD
HOME
About us
Company profile
Chairman's speech
Corporate culture
Staff style
Management team
Organizational structure
Party and government trade union
Product center
Product display
Product application
Typical case
Dynamic information
Company dynamics
Media report
Industry information
Qualification honor
Company qualification
Patent certificate
Test report
Technical support
Technical service
Tooling equipment
Human resources
Talent strategy
Recruitment information
Contact us
LOCATIONE >
HOME
Dynamic information
The first batch of units of Baihetan Hydropower Station was officially put into operation
On June 28, the first batch of units of Baihetan Hydropower Station on the Jinsh
State grid and Southern network second interconnection channel Minyue networking project started
On April 23, the Minyue networking project started. With an investment of 3.2 bi
The first transformer centralized control station based on the new generation of equipment monitoring system and digital twin technology was built in China
On April 22, China's first transformer centralized control station based on
The difference and selection of frame circuit breaker and moulded case circuit breaker
If the rated current, breaking capacity, and protection are met, can the plastic
The China Electricity Union forecasts that electricity consumption in the whole society will grow by 6-7% in 2021
Recently, at the press conference of the "2020-2021 National Power supply a
Kunliulong UHV multi-terminal flexible DC demonstration project put into operation
On December 27, Wudongde Power Station, the national key project of west-east po
"14th Five-Year Plan" will be planned to build seven UHV DC lines
On March 1, the State Grid Corporation issued the company's "carbon pea
The first DC distribution network demonstration project will be completed and put into operation before the end of June next year
Recently, the "Medium and Low voltage DC Power Distribution System Key Tech
The high proportion of new energy connected to the national interconnection grid will continue to strengthen
As China makes a "carbon peak, carbon neutral" commitment, and require
The first set of integrated storage and charging device in China is connected to the grid in Hunan Province
The 100 kW /270 KWH platform area storage and charging integration device indepe
«
1
2
3
4
5
6
»
此模块ID后台未找到,请在后台-首页模板中修改!
Home
Product
Consult
Dialing
Navigation